How to increase the capacity of red mud filter press
587Red mud filter press process dry production line respectively put into operation in July 2020, the actual capacity of a single filter press is only 50.36t/h, has not reached the design capacity of 55t/h; filter press capacity is not up to standard, resulting in an increase in the number of equipment operating units, spare parts, auxiliary materials, higher energy consumption, increased operating costs; red mud filter press operation...
View full text